Shaft station two miles underground
Seven 1,000 once bars of refined silver
Storage bins in lead oxide plant
Casting sticks of refined cadmium
Underground greenhouse
Ore chrushing operation
End of the miner's day
Loader in pillar slope
Silver Valley revegetation plan
Miner drilling in lead-silver ore
Ore train at loading station two miles underground
Particulates sketches
Removing zinc in refining stage
One ton lead blocks
100 pound lead pigs
25 pound caulking lead strings
Leaded-zinc oxide
1200 troy ounce silver bar
2400 pound zinc block
60 pound zinc slabs
20 pound zinc alloy bars
Flat zinc anodes
11 pound zinc anodes
Packaged cadmium sticks and balls
Sulfuric acid tank car
Packaging fertilizer
Several Pacific Division manufactured lead products
Winter morning view of Bunker Hill Smelter
Research and Analytical station
Fuming Plant cooloing towers and stack at dawn.
The Kellogg Tunnel
Overall view of Electrolytic Zinc Plant
Crane operator's view of ore preparation bins