Use the
scope section to limit your project. With a scope section, you can limit
-
Objectives (place the
“Scope” section after the “Objectives” section) or
-
Methods (place the
“Scope” section after the “Methods” section).
Not all
proposals need a scope section. Use this section if
-
you have proposed
objectives (or methods) that are beyond the scope of this project’s time constraints
-
you have proposed
methods that are already completed to emphasize that some of the project
is completed
-
you want to place
specific limitations on your objectives or your objectives have limited uses
-
you are not sure about
being able to complete one of the objectives or some part of the
objectives (or methods).